The 260,000 m² low-voltage package was delivered and accepted first time.
The NEV industrial park project, for which Msioo acted as low-voltage intelligent systems package contractor, has passed final acceptance, covering seven subsystems: video surveillance, perimeter alarm, card access, structured cabling, public address, data center works and an energy management platform.
The acceptance team spot-checked 320 camera points, 180 horizontal links and all data center equipment on site, with a 100% first-time acceptance rate. We now provide on-site maintenance with a two-year warranty and spare parts for critical equipment.
This is also the company's 200th completed project in the industrial park segment.